Fast-Track Innovation Enables Life Extension of Ormen Lange Gas Field

This paper addresses how close collaboration has enabled the development of a robust and cost-efficient solution for the Ormen Lange project by using carefully selected technology elements and an accelerated qualification process to mature them.

Fig.1—Ormen Lange Phase 3 scope.
Fig.1—Ormen Lange Phase 3 scope.
Source: OTC 35773.

Ormen Lange is a mature asset in the Norwegian Sea in a water depth of 1000 m. Ormen Lange Phase 3 is a project aimed at increasing the total recovery from the field by using a new solution for seabed compression. The selected compression concept relies on the use of a suite of technologies to be cost-effective. However, this has required a qualification program to mature these technologies.

×
SPE_logo_CMYK_trans_sm.png
Continue Reading with SPE Membership
SPE Members: Please sign in at the top of the page for access to this member-exclusive content. If you are not a member and you find JPT content valuable, we encourage you to become a part of the SPE member community to gain full access.