Testing page for app
-
The platform brings the field’s installed production capacity to 1.5 million BOPD.
-
SPE technical papers synopsized in each monthly issue of JPT are available for download for SPE members for 2 months.
-
Updates about global exploration and production activities and developments.
-
Field results highlight how rethinking tubing-anchor-catcher design can reduce gas interference and support late-life production.
-
Experience in subsurface production and lift design is shaping a new generation of geothermal operations built for reliability and scalability.
-
Operators are turning to new gas-lift and nanoparticle-fluid technologies to drive up production rates.
-
Only about one-third of Africa’s discovered hydrocarbon resources have reached commercialization.
-
This section lists with regret SPE members who recently passed away.
-
This paper describes a data-driven well-management strategy that optimizes condensate recovery while preserving well productivity.
-
This study identifies critical knowledge gaps in wellbore integrity and underscores areas that require further investigation, providing insights into how wellbores must evolve to meet the technical demands of the energy transition.