Testing page for app
-
The startup of a second FPSO will add 115,000 BOPD to the deepwater project offshore Angola, bringing overall production capacity to 230,000 BOPD.
-
The 15-year deal calls for 1 million tons of LNG to be shipped each year to the Iberian Peninsula. Final investment decision on the project is expected in the second half of 2019, with the first liquefaction train scheduled to start up in 2023.
-
The new satellite will build on the success of the company's demonstration satellite Claire, which has performed over 2,500 observations of oil and gas facilities as well as other natural and industrial sources of carbon dioxide and methane.
-
Putting SPE’s revised vision into action mandates extensive collaboration and effective engagement with a wide range of internal and external stakeholders.
-
Fed by big data loads from big operators, a university consortium and software firm are each working to make upstream data access as quick and easy as a Google search.
-
More than 250 industry leaders highly involved in Arctic E&P gathered for the 2018 Arctic Technology Conference recently in Houston.
-
Most underground gas-storage facilities are depleted reservoirs. What makes depleted reservoirs attractive is the presence of existing wells used to produce the reservoir, plus the geologic and engineering knowledge acquired during the development of the field.
-
This paper discusses studies conducted on two California offshore fields that may be abandoned in the near future. These studies examined the feasibility of repurposing these fields for offshore gas storage by using their reservoir voidage and existing pipeline facilities.
-
A preview of the 2019 Offshore Technology Conference
-
Tom Blasingame is the nominee for 2021 SPE President. He and four others make up the slate of nominees recommended for positions open on the SPE Board of Directors.