Testing page for app
-
Clough, an Australian LNG engineering company, has been awarded an engineering, procurement, and construction deal for the loadout line trestle for the LNG Canada project in Kitimat, British Columbia. The contract, worth an estimated $40 billion, covers a liquefaction facility, a 670-km pipeline from Dawson Creek, and a marine terminal. Construction activities began l…
-
One of the largest deepwater gas discoveries of the past decade moves closer to its expected startup at the end of the year, as 24,500 tonnes of topside units have been installed on the Leviathan platform offshore Israel. Operator Noble Energy expects to produce up to 1.2 Bcf/D from 4 subsea wells.
-
Still recovering from the oil price downturn, oilfield service companies are facing more headwinds.
-
Not all friction reducers are created equal. With dozens of varieties on the market, industry research suggests that oil and gas companies be choosy.
-
With production declining and a nearby terminal closed, UK authorities have given the nod for decommissioning to begin on the aging North Sea gas field. Perenco has been in operation since 1992, with Perenco taking over as operator from BP in 2003.
-
After failing to meet a previous 2018 deadline, the owners of the Bonny Island plant say they are close to sanctioning the expansion project following the signing of a letter of intent to a consortium of Saipem Chiyoda and Daewoo for EPC services. Train 7 will add 8 mtpa to Bonny Island’s production
-
Hearing loss is prevalent in workers in the mining and oil and gas extraction sectors. Approximately 61% of workers in mining and oil and gas extraction have been exposed to hazardous noise levels on the job, according to a study published in the American Journal of Industrial Medicine.
-
Average production from Bakken wells completed more than 3 years after they were drilled was approximately equal to wells drilled a year before they were put into service, according to a study by the US Energy Information Administration.
-
The company’s new approach is designed to cut the time required to generate optimal subsea field layouts.
-
BP announced that it will deploy continuous measurement of methane emissions in its future BP-operated oil and gas processing projects as part of its ambitious program to detect, measure, and reduce methane emissions.