Testing page for app
-
The operator drilled a pair of complex, ultraextended-reach-drilling (ERD) wells a mature offshore Western Australia field despite shallow reservoir depth, extreme ERD profile, and high tortuosity requirements.
-
-
Getting more out of gas lift requires understanding how gas injections interact with the oil, water, and gas flowing up the well—in other words, multiphase flow. Some papers are listed to get you started.
-
Dynamic simulation has proved an effective tool throughout the lifecycle of the deepwater Appomattox project, in large part because of implementation at an early stage.
-
As our industry continues to adapt and evolve to meet the changing needs of our fast-moving world, we see a sizable and growing prize for those who are willing to work and think differently, challenge traditional approaches, forge new working relationships, and act boldly.
-
Standalone or subsea development options remain in play.
-
Subsea production equipment falls to seafloor after winch wire malfunction.
-
A newbuild hull has been selected for facilities buildout.
-
The paper reviews an operator’s deepwater field project offshore Mauritania, for which several techniques were considered with respect to decommissioning a subsea pipeline system at water depths of 700 to 960 m.
-
President Tom Blasingame reminds SPE members that the pandemic is not over and that SPE has a long way to go before significant revenue is realized. However, SPE’s commitment remains strong to maintain consistent, high-quality services to its members—not only in good times, but in difficult times as well.