Testing page for app
-
The overarching theme of work published during the past year relating to production and facilities is performance and productivity improvement—doing more with less at a lower cost.
-
In the complete paper, the authors present a novel methodology to model interwell connectivity in mature waterfloods and achieve an improved reservoir-energy distribution and sweep pattern to maximize production performance by adjusting injection and production strategy on the well-control level.
-
Bottomhole assemblies (BHAs), as part of the drilling system, have dominating effects on the functionality and effectiveness of other system components. BHA design, usage, and monitoring must promote drilling-system compatibility, efficiency, and reliability.
-
Correct placement of the rotary-speed sweet spot of a bottomhole assembly (BHA) provides multiple benefits toward achieving the ultimate goal of drilling to section total depth in a single trip.
-
Microdoglegs are a natural effect of any vertical or directional well that can explain a wide variety of downhole problems.
-
A new fatigue-management work flow provides drillers with a tool to simulate and predict the life expectancy of bottomhole assemblies (BHAs) before fatigue causes problems.
-
The digitalization of oil and gas facilities is becoming a new technical arena. Effective solutions can be used to convert data into information and knowledge, which can then be used to improve maintenance operations.
-
The complete paper holds that traditional facilities-planning methodologies, heavily based on design-basis documents and biased toward the most-conservative conditions, fail to recognize the entirety of operational conditions throughout the oilfield life cycle.
-
Understanding and prioritizing water management is key for exploration-and-production operators, not only in terms of reducing overall cost but also as a means of mitigating operational risk, complying with changing regulatory requirements, and addressing environmental concerns.
-
As part of a comprehensive water-management strategy, this paper describes different process and operational considerations that are the result of 109 years of production in Argentina’s oldest basin.