Gas lift optimization has historically been a time-consuming process. Automated gas lift optimization can add incremental volumes without the need for major expenditure. This paper presents a closed-loop iterative well-by-well gas lift optimization workflow deployed to more than 1,300 operator wells in the Permian Basin. The workflow conducts multirate tests through remote control of gas lift injection-rate set points in combination with automated well‑data acquisition.
×

Continue Reading with SPE Membership
SPE Members: Please sign in at the top of the page for access to this member-exclusive content. If you are not a member and you find JPT content valuable, we encourage you to become a part of the SPE member community to gain full access.