Well intervention

Openhole Toe Isolation in HP/HT Well With Expandable Packer Saves Days of Rig Time

This paper documents the testing, integration, and field deployment of a metal expandable packer used as an openhole toe isolation plug in a deepwater well under high-pressure, high-temperature conditions.

Fig. 1—MEP OH plug and setting-tool components.
Fig. 1—MEP OH plug and setting-tool components.
Source: OTC 36363.

Openhole (OH) toe isolation in deepwater high‑pressure, high‑temperature (HP/HT) wells remains operationally complex when deeper drilling is required to confirm reservoir boundaries, oil/water contact (OWC), or proximity to salt. Conventional balanced cement plugs can be time‑consuming and uncertain, and risk additional remediation at ultradeep measured depths. The complete paper documents the testing, integration, and field deployment of a metal expandable packer (MEP) used as an OH toe-isolation plug in a deepwater well at approximately 30,000 ft true vertical depth under HP/HT conditions (to approximately 21,000 psi and 350°F).

Background

On a newly explored area in the deepwater Gulf of Mexico, a single-zone OH gravel pack (OHGP) was selected as the most-effective method to complete the wells. Batch drilling was performed for the three producer wells to the top of the reservoir, where the 10⅛-in.

×
SPE_logo_CMYK_trans_sm.png
Continue Reading with SPE Membership
SPE Members: Please sign in at the top of the page for access to this member-exclusive content. If you are not a member and you find JPT content valuable, we encourage you to become a part of the SPE member community to gain full access.