March 2026
(This offer expires 30 April 2026.)
CO2, Natural Gas, and Hydrogen Storage
The UK's First CO2 Transportation and Storage Project Takes FID
Production Monitoring
Offshore Production Surveillance and Intervention Using Multiagent AI
High Pressure/High Temperature
Geothermal Energy
Designing the Record-Breaking Enhanced Geothermal System at Project Cape
April 2026
(This offer expires 31 May 2026.)
Natural Gas Processing and Handling
Completions
Heavy Oil
Field Implementation of a New Inflow-Control Device Design in Surmont I SAGD
Maximizing SAGD Performance at Blowdown Phase Through Autonomous Inflow-Control Valves
Introduction of Dynamic Gas Separation to SAGD
History Matching and Forecasting
Combining Adjoint Gradient With Commercial Reservoir Simulator for Efficient History Matching
Topics Coming Up in May
Deepwater Fields | Intelligent Operations | Extended-Reach and Complex Wells | Cementing and Zonal Isolation.