Aker Solutions
-
Thailand’s PTTEP is partnering with subsea joint venture SLB OneSubsea to expand capacity across two fields offshore Malaysia.
-
The contractor will deliver a similar carbon dioxide injection system to the one it completed for phase one in 2023.
-
The company has installed an autonomous drone system on Aker BP’s Edvard Grieg platform in the North Sea, enabling frequent, remote inspections from shore.
-
Operator Cenovus expects the concrete gravity structure to be moved in June, first oil to be produced in Q2 2026.
-
The massive vessel moved from Aker Solutions quayside to begin sea trials ahead of deployment in the Barents Sea prior to year-end.
-
The first wells from the current North Sea development project are expected online in 2026.
-
Aker Solutions, SLB, and Subsea 7 have joined to create a subsea engineering firm to drive innovation and efficiency in subsea production.
-
The deal covers the supply of more than 50 km of dynamic and static subsea umbilicals.
-
First production from the UK North Sea gas field is expected in the second half of 2025.
-
A Schlumberger, Aker Solutions, and Subsea 7 partnership will collaborate on international subsea projects.
Page 1 of 3