Garden Banks Pipeline
-
Garden Banks Pipeline was notified that the Sea Robin delivery point was also made available after Enbridge lifted its force majeure.
-
A platform connecting to the Garden Banks pipeline was undamaged by Hurricane Laura, but Enbridge declared force majeure after inspecting the facilities.