integrated asset modeling
-
This paper describes the development of a comprehensive digital solution for well surveillance and field-production optimization for an offshore field consisting of four stacked reservoirs, each containing near-critical fluids.
-
The offering includes automatic evaluation of project economics and enhances collaboration to cut the time required for field development planning by up to 50%, according to the companies.
-
SponsoredGain deeper insights on your system and its performance. Use integrated modeling to explore the effects of changing conditions and equipment to avoid unplanned downtime.
-
The awards will be presented on 23 March at the Kuala Lumpur Convention Centre.
-
With declining trends in production and dwindling reserves for a 35-year-old offshore field, the Samarang Redevelopment Project was initiated with a vision toward implementing integrated operations as an asset-management decision-support tool.
-
There has been increasing interest in integrated simulation of reservoirs, wells, and surface facilities, which is particularly important for companies with major assets in deep offshore fields.
-
This paper describes a case study in which four reservoir models were coupled with a production-network model, with the objectives of maximizing recovery factors, identifying operational problems, and evaluating water-production effects.