Decommissioning
This paper uses the structural-integrity-management framework to evaluate the current structural integrity of chosen platforms, highlighting their potential and limitations for carbon capture, use, and storage purposes based on in-service assessments.
This paper reviews a proof-of-concept project in which surplus casing pipes were used in the fabrication of purposefully designed artificial reef structures for the enhancement of biodiversity and commercial fisheries.
ABL’s Australia unit will provide marine warranty survey services to support the first phase of Esso’s decommissioning campaign, which aims to recycle 95% of the 60,000 tons of offshore structures targeted for removal.
-
With regulatory pressure and the cost of decommissioning increasing, many operators are seeking new and better decommissioning methods that could get more work done safely and at a lower cost.
-
A team of oil and gas consultancy companies have formed a collaborative program aimed at offering integrated support for operators looking to retire redundant facilities without in-house overhead.
-
Eight salvage experts have boarded the Transocean Winner, which ran agorund off the Isle of Lewis on 8 August.
-
The Noble Jim Day semisubmersible (left) arrived at Harbor Island in Port Aransas, Texas, on 29 July to be cold stacked.
-
A new method for accessing and cementing hard-to-reach spaces around complex offshore wells.
-
Many of the platforms in the North Sea are late in life, operating long past their initial design expectations due to costly life-extension work. Decommissioning has moved slowly, but the low price environment is likely to accelerate the trend.
-
Techniques for well-abandonment log evaluations have been studied in the Gulf of Mexico since 2012. The new methods described in this paper consist of adding nuclear sensors to supplement the acoustic measurements and introduce novel processing methods.
-
With the current low-oil-price environment, the cost of decommissioning is seen as a key driver for the ongoing economic viability of the basin.
-
This paper presents current advances in the development of a plasma-based milling tool and its use in casing-section milling for P&A.
-
This paper presents the challenges and obstacles faced in the use of a new technology for the plugging and deoiling of sections of unpiggable flowlines before decommissioning.