Enhanced recovery
As Egypt’s largest oil and gas investor, Eni is ramping up its 2026–2027 drilling campaign with new investments cross the Mediterranean offshore, Nile Delta, Western Desert, and offshore Sinai to strengthen the country’s role as a regional gas and LNG export hub.
This paper presents a case study from a mature field redevelopment project where pulsed neutron logging was integrated with advanced reservoir modeling to improve the understanding of fluid-contact dynamics and optimize new horizontal well placement.
This paper aims to showcase examples of how integrated analysis of surveillance data in the Azeri-Chirag-Gunashli field has improved reservoir understanding and informed reservoir-management decisions.
-
Currently, there are few studies on smart waterflooding in tight and very tight oil reservoirs. This work examines smart-waterflood opportunities in such reservoirs.
-
Previous studies demonstrate that Montney rock samples present a dual-wettability pore network. Recovery of the oil retained in the small hydrophobic pores is uniquely challenging.
-
This paper presents the performance results from one of the waterflood pilots in the Viewfield Bakken.
-
This paper discusses a crestal gas-injection project that was carried out in a supergiant heterogeneous-carbonate oil field.
-
The authors discuss a new way of extracting deformation information from radar imagery, contributing to improved accuracy of InSAR surface-elevation monitoring.
-
An operator has designed a demonstration project for carbon dioxide (CO2) enhanced oil recovery (EOR) and has implemented it in one of its fields.
-
Global emissions of CO2 resulting from the use of fossil fuels amount to approximately 35 billion tons/yr. How much of this can we capture? How much can we store or sequester? And, perhaps the most important question: How much will it cost and who will pay?
-
The Southwest Partnership on Carbon Sequestration (SWP) is one of seven large-scale demonstration projects sponsored by the US Department of Energy.
-
Low oil prices have made the goal of this Petrobras project and its four partners to lower the break-even price of operating to USD 35/bbl.
-
This paper describes both design and economic considerations that lead to the selection of vacuum-insulated tubing (VIT) or vacuum-insulated casing (VIC) for the completion of thermal wells.