Flow assurance
This paper details the importance and value derived from a real-time process-twin model for one of the world’s largest operating carbon dioxide sequestration projects.
This paper presents a comprehensive analysis of autonomous scale-management strategies implemented in the Buzios Field that eliminate the need for a well-service stimulation vessel by using existing facilities onboard the well rig.
This study demonstrates the transformative potential of physics-informed neural networks as a hybrid framework for multiphase flow measurement.
-
Medium-voltage electric heating systems offer reduced installation cost and increasing efficiency for multimegawatt oil and gas heating applications compared with low-voltage systems. For offshore applications, the systems offer the added benefit of both space and weight reductions.
-
Thermoplastic composite pipe (TCP) is a spoolable, fully bonded pipe with glass or carbon-fiber reinforcements. While most often used in deep water, the combination of a solid wall, spoolability, and corrosion resistance makes TCP attractive for production-flowlines in shallow water also.
-
A presentation from the 2016 Gulf of Mexico Deepwater Technical Symposium examines a testing strategy to determine the effectiveness of paraffin inhibitors.
-
This paper presents a state-of-the-art review of scale-inhibitor-analysis techniques and describes how these techniques can be used to provide cost-effective scale management.
-
An experimental study was conducted by use of a 6-in.-inner-diameter facility to analyze three-phase stratified wavy flow in horizontal pipelines.
-
In trying to reduce the footprint of facilities, operators often select the wrong piping components, hampering the performance. Selection of the right piping can avoid separation issues.
-
Construction costs, contractor involvement, flow assurance, and the integration of new technologies created to improve production are some of the deepwater challenges exacerbated by the current low price environment.
-
Use of surfactants and gas lift in combination to suppress severe slugging were tested. Surfactants were able to suppress severe slugging for most of the cases, and gas lift helped significantly.
-
The Tamar deepwater gas development offshore Israel experienced a short 4-year gap between discovery and startup, but doing so required the tough decisions in handling significant flow assurance issues.
-
Flow assurance issues offshore fall into three main categories -- production chemistry (deposition), operational issues (sand, slugging, foaming, emulsions) and integrity (corrosion, erosion)