Asset Management
The deal adds 40,000 B/D of production and epands Cenovus’ SAGD footprint with three Alberta assets.
The Federal Reserve Bank of Dallas’ third-quarter energy survey reflects industry views on the drawdown of the US Strategic Petroleum Reserve, the outlook for Persian Gulf crude exports, and expectations for oil prices.
This paper presents a flexible, highly cost- and energy-efficient method of gas separation and CO₂ capture from many different gas mixtures with a large range of CO₂ concentrations.
-
The company is set to supply offshore well services and subsea systems for Vår Energi-operated fields on the Norwegian Continental Shelf.
-
The 187-MW Peacock Solar project, expected to come online in the second half of 2024, is designed to help power a Gulf Coast Growth Ventures petrochemical complex.
-
Operator pays $400 million for a 40% stake in tract that contains the $6-billion Cameia/Golfinho project.
-
The heated global jackup rig market has day rates for premium units climbing higher.
-
Production from the field northwest of the Shetland Islands is expected to start in 2026 or 2027.
-
The oil and gas industry-backed geothermal firm plans to drill up to 29 wells in southwestern Utah that will deliver electricity to the state's grid by 2026.
-
The development scheme for BM-C-33 includes an FPSO capable of processing gas and condensate without further onshore processing.
-
The contractor will transport and install pipeline related to the Wahoo development in the Campos Basin.
-
Wind power keeps rising across the globe, while new solar plant developments light up Louisiana and Texas.
-
Louisiana-based Commonwealth LNG project takes another step closer to FID with EQT HOA.