Management
The Middle East’s largest unconventional gas development officially begins production as Saudi Aramco targets 6 million BOE/D of gas and liquids capacity by 2030.
While physical damage to energy infrastructure has so far been limited, analysts caution that a prolonged conflict could drive prices higher even as OPEC+ proceeds with planned incremental supply increases.
The integrated field management services contract signals an evolution of KBR’s role at Majnoon from one of stabilizing production to a more complex and sophisticated role that takes responsibility for integrating full upstream operations.
-
The international major's low-cost development plan calls for a subsea tieback that will transport oil and gas through a single flowline to an existing floating production facility.
-
The current oil and gas commodity prices have posed several challenges to oil and gas companies operating in shale plays trying to generate revenue or even becoming cash neutral.
-
Renewable energy is often framed as being at odds with the oil and gas industry, but new price developments in the wind and solar sectors may be changing this paradigm, according to one US energy expert.
-
Organizational determinants of shift work practices are not well characterized; such information could be used to guide evidence-based research and best practices to mitigate shift work’s negative effects.
-
Figuring out the right price for an active oil and gas field is tricky business in the shale sector but one producer explains how it uses data analytics to get a clearer picture.
-
A sudden surge in job openings in the Bakken, especially for hydraulic fracturing and completion crews and CDL drivers, is taking place as companies ramp up to put more wells on line in the first half of 2017.
-
PDC’s president and CEO describes the company’s management strategy for its hydraulic fracturing operations in the Wattenberg Field and the Delaware Basin.
-
Completed 11 months ahead of schedule, BP’s Thunder Horse South Expansion project furthers the company’s deep water agenda.
-
The CEO of Phillips 66 expects the DAPL to be operational in 2Q 2017.
-
As drilling activity rises, the demand for all that is needed to complete wells rises even faster. The wells are bigger, and more water and sand are used for each foot stimulated.