Asset Management
Schneider Electric says the deal advances its vision of creating intelligent industrial ecosystems that connect physical assets with digital insights across the asset life cycle.
The events will be co-located 3–5 May 2027 at Reliant Park in Houston, Texas.
The firm’s latest analysis puts the bulk of the blame on a fragmented supply chain.
-
In this paper, example machine-learning models were trained using geologic, completion, and spacing parameters to predict production across the primary developed formations within the Midland Basin.
-
The authors of this paper present the results of an assessment of two regions in Uruguay suitable for bottom-fixed offshore wind technologies.
-
The discovery in Putumayo could benefit from nearby existing infrastructure.
-
The Anita Garibaldi was built by MODEC and will produce Marlim and Voador together with FPSO Anna Nery, already in operation.
-
Mukuyu-1 sidetrack proves a working hydrocarbon system in the Cabora Bassa basin.
-
Wellesley estimates that the drilling campaign has proved a developable gas-condensate accumulation of 60 to 100 million BOE.
-
The Uganda oil project envisions drilling more than 450 wells on 35 well pads, leading to an estimated production of 230,000 BOPD at its peak once production starts up.
-
The next phase of drilling is expected to resume in mid-2024 and includes several sidetrack wells, long-reach directional wells, and stratigraphic exploration wells.
-
Challenges to development, including costs, cited as reasons for turning back the acreage.
-
Jackup rig Borr Norve has started drilling operations on the project’s fourth production well, DHIBM-6H.