Onshore/Offshore Facilities
The declaration builds on a memorandum of understanding the partners signed with Egypt in May to process Block 10 gas at the country’s LNG export and domestic gas facilities.
Alongside the new subsea awards, Equinor strengthened its position in the 400-million-bbl Bay du Nord development by acquiring BP’s interest in the project.
The events will be co-located 3–5 May 2027 at Reliant Park in Houston, Texas.
-
Total is making an LNG push by spending up to $2 billion for assets belonging to fellow French firm Engie.
-
In this study, the effects of the hydrodynamic parameters are decoupled with specially designed flow-loop experiments. The results enhance understanding of the deposition behavior at various hydrodynamic conditions and aid in scaling up from laboratory to field conditions.
-
In this study, two coatings were produced and evaluated to determine their effect on hydrate adhesion onto carbon-steel surfaces.
-
This paper presents the traditional methods of hydrate mitigation used in the NKJ fields and the way in which a transient model was initially built and continuously improved.
-
Mitigation of flow-assurance problems continues to drive new production-technology applications and approaches. The three papers highlighted here focus on minimizing costs while providing safe, effective, and reliable operations.
-
McDermott announced a letter of award for a contract from Reliance Industries for the deepwater KG-D6 subsea field development in the Krishna Godavari Basin.
-
A proactive approach with EPC contract bidders to front-end load HSE strategies will pay dividends. This paper discusses the HSE management strategy for the Lake Charles Liquefied Natural Gas project.
-
Since the Macondo disaster, industry publications have discussed the equipment, connections, and interfaces needed for capping and containing a blowing subsea well, but they give little insight into developing a well-specific subsea capping contingency plan.
-
During the dismantling and removal of fire-water-pump columns of superduplex stainless steel barely 1 year after plant startup in a redeveloped brownfield offshore Nigeria severe localized pitting corrosion was observed in the columns. This paper explores the findings and identifies the reasons.
-
The circular economy approach to decommissioning brings a new perspective that considers reuse and regeneration as critical aspects to be considered along with other matters from the earliest stages of designing and constructing assets.