Onshore/Offshore Facilities
The Absheron gas field expansion will supply additional natural gas to Azerbaijan’s domestic market and support its export commitments to Turkey, allowing Baku to stay focused on meeting its gas export obligations to Europe.
A credible custody-transfer record depends on far more than the accuracy of a single meter. It is the product of an integrated measurement chain. While meter performance supports measurement-system integrity, commercial confidence also depends on traceability, governance, and authorization.
Despite significant progress in capturing associated gas for domestic use, Iraq remains the world’s third-largest gas-flaring country as it aims for higher oil and gas production targets.
-
This is the second EPC contract Bechtel signed for Port Arthur LNG. Final investment decision is expected this year.
-
The largest oil and gas major in the US is calling for tighter rules around methane monitoring, wellhead venting, and the replacement of equipment components with “high-leak potential.”
-
DNV GL researched over 1,000 failure cases to identify failure-prone components. The research is based on cases from its global network of labs.
-
The Damietta LNG plant is expected online by June 2020. The plant will be owned by ENI, EGAS and EGPC.
-
Train 2 has a projected export capacity of 4 mtpa. Train 3 is expected to reach production in Q2 2020.
-
SPE’s technical sections offer communities rich with industry expertise. And your engagement adds to the wealth of knowledge to be shared.
-
Instead of burning money, why not make electricity? This is the big pitch being made by a growing number of technology companies who see green every time they see a red-hot flare burning associated gas.
-
The complete paper presents a practical approach for validating design-verification analysis for subsea equipment, using a representative pressure valve block to correlate finite-element analysis (FEA) predictions for strain changes with actual measured changes.
-
The complete paper describes the generation of additional fundamental solubility data under HP/HT conditions and comparison of the obtained values with several existing models.
-
Phillips and Trafigura JV expected to load VLCCs. The project is in the permitting stage with an FID expected this year.