Onshore/Offshore Facilities
Alongside the new subsea awards, Equinor strengthened its position in the 400-million-bbl Bay du Nord development by acquiring BP’s interest in the project.
The events will be co-located 3–5 May 2027 at Reliant Park in Houston, Texas.
The supermajor said the fields are not expected to contribute meaningfully to its production profile by 2030.
-
Production from an offshore Angola field has been decreasing because of subsea pressure declines amid water-cut increases and limited gas compressor capacity. The development process leading to the selection of high-boosting multiphase pumps is described.
-
Want to do a quick test of your project execution skills? Try this 10-question quiz.
-
At least four US pipeline companies have seen their electronic systems for communicating with customers shut down over the last few days, with three confirming it resulted from a cyberattack.
-
An 18-month project will develop and trial a mobile robot for autonomous operational inspection of Total facilities.
-
Currently, the state of the art for subsea well control is based on hydraulic technology. Hydraulic fluid is supplied from a host facility to the subsea wells through dedicated tubes within an umbilical and is distributed to the wells.
-
Despite a dip earlier in the year, natural-gas prices remained steady over 2017, averaging $2.99/million Btu. … Early 2018 has been a different story, however, with natural-gas prices already hitting a couple of peaks (of greater than $5/million Btu according to the Henry Hub Spot Price history).
-
Offshore oil-exploration drilling and testing are key for the production of oil; however, a number of associated challenges, particularly the handling of associated gas, must be overcome.
-
This paper presents details of the retrofit scrubber design and shows the importance of using high-efficiency separation internals.
-
With the huge amount of water injection in the industry, the need is paramount for a more scientific approach to materials selection for tubing, especially CRAs. Software-based predictors similar to those developed for CO2 corrosion would improve the economical choice of CRAs.
-
Hurricane Energy is still on pace for first oil in 2019 for the Lancaster field, which may lead to more significant development in the UK North Sea.