Onshore/Offshore Facilities
The Granat prospect on the Norwegian Continental Shelf may be developed with a subsea tieback to existing infrastructure.
The planned facility was designed to process 34 MMcf/D of associated gas into fully refined gasoline.
The awards build on Tenaris’ role in earlier phases of the ultradeepwater Black Sea project.
-
Subsea pumps are used for gas/liquid separation, subsea compression, and subsea boosting. Solutions aiming at cost reductions are crucial to make subsea processing projects feasible. A cost- and complexity-reduction solution for the subsea electrical power supply is a critical consideration.
-
Operator or manufacturer’s reports and published papers are reviewed and a criterion is developed for subsea pump selection.
-
Production from an offshore Angola field has been decreasing because of subsea pressure declines amid water-cut increases and limited gas compressor capacity. The development process leading to the selection of high-boosting multiphase pumps is described.
-
Want to do a quick test of your project execution skills? Try this 10-question quiz.
-
At least four US pipeline companies have seen their electronic systems for communicating with customers shut down over the last few days, with three confirming it resulted from a cyberattack.
-
An 18-month project will develop and trial a mobile robot for autonomous operational inspection of Total facilities.
-
Currently, the state of the art for subsea well control is based on hydraulic technology. Hydraulic fluid is supplied from a host facility to the subsea wells through dedicated tubes within an umbilical and is distributed to the wells.
-
Despite a dip earlier in the year, natural-gas prices remained steady over 2017, averaging $2.99/million Btu. … Early 2018 has been a different story, however, with natural-gas prices already hitting a couple of peaks (of greater than $5/million Btu according to the Henry Hub Spot Price history).
-
Offshore oil-exploration drilling and testing are key for the production of oil; however, a number of associated challenges, particularly the handling of associated gas, must be overcome.
-
This paper presents details of the retrofit scrubber design and shows the importance of using high-efficiency separation internals.