Onshore/Offshore Facilities
The long-term outlook analysis says a potential shift toward new construction could push 2026 production 3% above 2025 levels.
This paper identifies opportunities and risks associated with repurposing an offshore oil and gas platform for green hydrogen production. Various technical scenarios were investigated for the case study platform, and their profitability was determined using economic calculations. In addition, all the submodels were compared with standard decommissioning costs for reco…
This paper presents a flexible, highly cost- and energy-efficient method of gas separation and CO₂ capture from many different gas mixtures with a large range of CO₂ concentrations.
-
Contractor, operators will work to bring thermoplastic composite pipe (TCP) flowline and riser technology to market.
-
A fire at Ku-Maloob-Zaap killed five and sidelined more than 400,000 BOPD.
-
The three service operations vessels are committed under a long-term contract at the Dogger Bank wind farm offshore UK.
-
Guyana boasts some of the world's most economic offshore fields. Now it must navigate how to produce them in a world that is asking for oil producers to pull back.
-
This years’ Offshore Technology Conference is full of people working on ways to diversify away from just oil and gas.
-
The Heerema semisubmersible crane vessels Thialf and Sleipnir were used on the job to remove the 36,000-ton structure.
-
A subsidiary-owned pipeline near Marmon, North Dakota, spilled more than 700,000 bbl of produced water over a period of almost 5 months in 2014–2015.
-
Much has been written on the upcoming supply crunch in the investor-friendly offshore wind installation market, but what are the challenges facing contractors looking to capitalize on this growth and optimize any potential investment in new assets?
-
The complete paper provides tools useful for decision-makers to prevent adverse pipeline incidents caused by human action, poor facility performance, accidents, emergencies, and external events.
-
The facility is the second delivered under Aker BP’s platform alliance designed to use a more integrated project delivery model.