Onshore/Offshore Facilities
This paper identifies opportunities and risks associated with repurposing an offshore oil and gas platform for green hydrogen production. Various technical scenarios were investigated for the case study platform, and their profitability was determined using economic calculations. In addition, all the submodels were compared with standard decommissioning costs for reco…
This paper presents a flexible, highly cost- and energy-efficient method of gas separation and CO₂ capture from many different gas mixtures with a large range of CO₂ concentrations.
This work introduces a novel predictive methodology combining historical metocean data with real-time riser analysis for shallow water dynamically positioned rig operations.
-
The drop in US LNG exports comes amid a combination of weak demand, ample supply, additional capacity coming on line, and flexibility to cancel US cargoes.
-
iHawk, Cyberhawk’s cloud-based asset visualization software, will become Shell’s next-generation visualization software platform for all onshore, offshore, and subsea assets, as well as all global construction projects.
-
Designed to be a “living” map, it focuses on the largest fixed infrastructure for crude oil and refined products such as trunk pipelines, refineries, and storage facilities.
-
Poland state officials said the terminal expansion is crucial to strengthening the country’s energy security by increasing its capacity to receive LNG and gas from European countries and decreasing its dependence on Russia.
-
The vessel is capable of operating as both an FSRU and a fully tradable LNG carrier.
-
The contract continues the two companies’ 8-year working relationship; in 2012, they performed the world’s-first underdeck inspection.
-
Armada to install ROV launch and recovery system on its fleet of robotic ships.
-
Potential suitors to acquire Chevron’s stake in the LNG project include co-owner and operator Woodside.
-
Why steel casing or tubing? What does it have to do with sustainability? Is it time to change? These are a few of the questions we need to think about to move from the status quo.
-
Supreme Court upholds ACP’s controversial permit to lay pipe under national forest and across two states.