Onshore/Offshore Facilities
After a record year for LNG project approvals in 2025, multiyear repairs to war-damaged liquefaction facilities in Qatar and the UAE threaten to slow the growth of global LNG capacity.
The declaration builds on a memorandum of understanding the partners signed with Egypt in May to process Block 10 gas at the country’s LNG export and domestic gas facilities.
Alongside the new subsea awards, Equinor strengthened its position in the 400-million-bbl Bay du Nord development by acquiring BP’s interest in the project.
-
Internal corrosion has caused ADNOC to suffer loss of containment in oil flowlines in a giant onshore field. This paper describes the successful 5-year field trial program and confirmation that HDPE liner application in carbon steel pipe can be a cost-efficient way to mitigate internal corrosion.
-
Using machine learning (ML), image recognition, and object detection, the use of ML on algorithms to recognize objects and describe their condition were investigated—offering new possibilities for performing inspection and data gathering to evaluate the technical condition of oil and gas assets.
-
The virtual storefront will allow Freeport LNG to match physical, bilateral transactions with potential offtakers in a variety of trading formats. It is expected to launch this November.
-
Oil prices rose on the news that Saudi Arabian production was disrupted by aerial attacks. The massive outage might may boost US exports to new highs.
-
Tensions in the region spike as US blames Iran.
-
The deal sees Energy Transfer gain, among other assets, various crude and natural gas liquids pipelines running from the Denver-Julesburg and Anadarko Basins.
-
With production declining and a nearby terminal closed, UK authorities have given the nod for decommissioning to begin on the aging North Sea gas field. Perenco has been in operation since 1992, with Perenco taking over as operator from BP in 2003.
-
After failing to meet a previous 2018 deadline, the owners of the Bonny Island plant say they are close to sanctioning the expansion project following the signing of a letter of intent to a consortium of Saipem Chiyoda and Daewoo for EPC services. Train 7 will add 8 mtpa to Bonny Island’s production
-
One of the largest deepwater gas discoveries of the past decade moves closer to its expected startup at the end of the year, as 24,500 tonnes of topside units have been installed on the Leviathan platform offshore Israel. Operator Noble Energy expects to produce up to 1.2 Bcf/D from 4 subsea wells.
-
The company’s new approach is designed to cut the time required to generate optimal subsea field layouts.