Onshore/Offshore Facilities
The supermajor said the fields are not expected to contribute meaningfully to its production profile by 2030.
This paper reviews a proof-of-concept project in which surplus casing pipes were used in the fabrication of purposefully designed artificial reef structures for the enhancement of biodiversity and commercial fisheries.
This paper presents a study that confirms glass-reinforced-epoxy-lined tubing as a reliable, cost-effective solution for long-term water-injection service in moderate-salinity offshore environments.
-
Woodside Energy's Trion field offshore Mexico features a four-column semisubmersible FPU with a production capacity of 100,000 BOPD.
-
The producer’s Lime Rock and Venice discoveries were brought on stream in late December.
-
Located in the National Petroleum Reserve in Alaska, the Willow project is estimated to produce 180,000 BOPD at its peak.
-
Production from the Sparta field is expected to start in 2028.
-
A pilot project will explore onboard carbon capture for container ships, and two heavy-hitters are teaming up to find decarbonization paths in the Asia Pacific region. Elsewhere, wind and solar are on track to pass coal in the race to generate electricity.
-
The deal is subject to Mexico Pacific taking a final investment decision on the proposed third train at the Saguaro Energia LNG Project on Mexico’s Pacific Coast.
-
The well was spudded from the new Azeri Central East platform in the giant ACG field in the Caspian Sea.
-
It seems that it has been a very productive period for production and facilities. I reviewed a significant number of abstracts on such an interesting variety of topics—new technology developments down- and midstream, improvements in corrosion detection and prediction, new systems for emulsion monitoring, and even downhole drones.
-
This paper discusses housing pulverized blades mixed with Portland cement in wells considered for plugging and abandonment.
-
This paper outlines issues to be resolved during facility design and provides guidelines, calculations, and examples for sand-handling steps to be implemented after separation.