Onshore/Offshore Facilities
The supermajor said the fields are not expected to contribute meaningfully to its production profile by 2030.
This paper reviews a proof-of-concept project in which surplus casing pipes were used in the fabrication of purposefully designed artificial reef structures for the enhancement of biodiversity and commercial fisheries.
This paper presents a study that confirms glass-reinforced-epoxy-lined tubing as a reliable, cost-effective solution for long-term water-injection service in moderate-salinity offshore environments.
-
This paper discusses housing pulverized blades mixed with Portland cement in wells considered for plugging and abandonment.
-
This paper outlines issues to be resolved during facility design and provides guidelines, calculations, and examples for sand-handling steps to be implemented after separation.
-
The contracts awarded by ExxonMobil and Equinor are for work offshore Guyana and Brazil.
-
The captured carbon dioxide will be permanently sequestered in the Cameron Parish CO2 Hub to be located offshore Louisiana.
-
As the vessel moves toward a shipyard to be dismantled, the company said it wants to become a global reference in decommissioning, focusing on sustainability, safety, and care for people and the environment.
-
Shell has tapped the contractor to conduct engineering, procurement, construction, and installation work on the large gas field offshore Trinidad and Tobago.
-
Suncor Energy brought the Terra Nova FPSO back into production as part of an extensive field life extension project offshore Newfoundland and Labrador.
-
The job will increase the Heerema vessel’s second main hoist capacity by 1200 mt.
-
The Haewene Brim FPSO will need repairs to a pair of mooring connections before it can restart operations.
-
With the startup of South Ghawar field complete, the Saudi national oil company can look toward the commercialization of its tight-gas giant, Jafurah.