Onshore/Offshore Facilities
The events will be co-located 3–5 May 2027 at Reliant Park in Houston, Texas.
The supermajor said the fields are not expected to contribute meaningfully to its production profile by 2030.
This paper reviews a proof-of-concept project in which surplus casing pipes were used in the fabrication of purposefully designed artificial reef structures for the enhancement of biodiversity and commercial fisheries.
-
The testing, inspection, and certification company is reporting a 900% rise in demand for the remote inspection of offshore assets and equipment since the outbreak of the COVID-19 pandemic.
-
The race is on to fill NWS gas export plant.
-
Two intelligence groups share similar views on how the fallout from the COVID-19 pandemic has impacted OFS companies’ valuations and operations.
-
Train 7 is scheduled for commissioning by 2024 and would bring total capacity of Nigeria LNG’s complex to 30 mtpa.
-
New LNG capacity in 2019 kept pace with higher trading volumes and supply/demand growth. Key questions and barriers still remain for the future of the LNG industry in 2020.
-
Wind turbine substructures and anchors made of special concrete would float to a site from an onshore plant.
-
The AI-driven tool will detect anomalies in subsea oil and gas infrastructure.
-
I suspect that most people’s 2022–2030 strategic planning windows have shifted. Operational and tactical plans and strategies will need to be based on a widely divergent set of assumptions.
-
The W-Industries contract comes 2 months after Worley was awarded a master service agreement for services on the Mozambique LNG project.
-
Proposal requests were sent to companies to solicit partnerships for the project with ADNOC and ADPower.