Onshore/Offshore Facilities
This paper identifies opportunities and risks associated with repurposing an offshore oil and gas platform for green hydrogen production. Various technical scenarios were investigated for the case study platform, and their profitability was determined using economic calculations. In addition, all the submodels were compared with standard decommissioning costs for reco…
This paper presents a flexible, highly cost- and energy-efficient method of gas separation and CO₂ capture from many different gas mixtures with a large range of CO₂ concentrations.
This work introduces a novel predictive methodology combining historical metocean data with real-time riser analysis for shallow water dynamically positioned rig operations.
-
Tons of resources are devoted to assure the integrity of facility piping systems, but are the generally accepted methods of inspecting these systems the best way? Complex systems with above- and underground piping sections may require a combination of direct assessment and elements of an API code.
-
ADNOC awarded a $1.36-billion dredging, land reclamation, and marine construction contract to the UAE’s National Marine Dredging Company (NMDC) for the construction of multiple artificial islands in the first phase of development of the Ghasha Concession.
-
Petrobras has awarded TechnipFMC with an engineering, procurement, construction, and installation (EPCI) contract for the Mero 1 pre-salt field, located in the Santos Basin at 2100 m offshore Brazil. The contract covers the engineering, procurement, and construction of all rigid lines, as well as the installation and precommissioning of all the infield risers and the …
-
Anadarko Mozambique Area 1, LTDA, a subsidiary of Anadarko Petroleum Corp., named the preferred tenderers for provision of the subsea production systems. Formal award will follow final agreement of contracts and Mozambique LNG taking a final investment decision, expected in the first half of this year.
-
Wood and KBR inked a multimillion-dollar contract to deliver integrated front-end engineering design (FEED) for Shell Australia's Crux project to build a not-normally-manned (NNM) platform and gas export pipeline located approximately 600 km north of Broome, offshore Western Australia (WA). The Crux field water depth is 110 to 170 m.
-
The SPAs signed with Shell and Tokyo Gas take Anadarko’s long-term sales from the project to more than 7.5 mtpa, with additional deals expected in the near future.
-
Petrobras and Shell have brought online the Lula field’s seventh FPSO as the firms continue to ramp up production from the pre-salt Santos Basin.
-
The deal calls for CNOOC to get 1.5 mtpa of gas from the Anadarko-operated Mozambique LNG project over the next 13 years. The project is the first onshore LNG development for the coastal East African nation.
-
The $10-billion deal will add liquefaction and export capabilities to the existing facility in Sabine Pass, Texas, according to a Reuters report. Golden Pass currently handles up to 2 Bcf/D of natural gas imports to North American markets.
-
When energy companies go bankrupt, the cleanup of their old oil and gas wells must take priority over paying off creditors, the Supreme Court of Canada ruled on 31 January.