Onshore/Offshore Facilities
This paper identifies opportunities and risks associated with repurposing an offshore oil and gas platform for green hydrogen production. Various technical scenarios were investigated for the case study platform, and their profitability was determined using economic calculations. In addition, all the submodels were compared with standard decommissioning costs for reco…
This paper presents a flexible, highly cost- and energy-efficient method of gas separation and CO₂ capture from many different gas mixtures with a large range of CO₂ concentrations.
This work introduces a novel predictive methodology combining historical metocean data with real-time riser analysis for shallow water dynamically positioned rig operations.
-
Operators need to take steps to protect their facilities from drone security breaches by outsiders. The costs an attacker incurs in developing tools to break into and control infrastructure is low compared to the costs an operator incurs in defending against those tools.
-
Cost and delivery of long-distance natural gas pipelines to a distant liquefaction facility at a warm-water port has become excessive, and environmental restraints have been increasing. An alternative is an offshore ice-resistant LNG port accommodating a new class of LNG transport vessels.
-
To reduce the risks to arctic pipelines from natural or geologic hazards, a more sophisticated approach to routing compared to traditional methods based on only the shortest length of pipe or connectivity to existing infrastructure is needed.
-
As the design methodologies evolve for arctic pipelines, strudel scour, permafrost thaw settlement, and ice gouging need to be factored in with environmental and geotechnical data, limit states, and trenching and backfilling activities.
-
New approaches to arctic activities include a concept for an offshore ice-resistant LNG export terminal, the design of subsea pipelines, and the optimal routing for the pipelines to mitigate the unique risks in arctic regions such as ice-gouging and permafrost thaw.
-
One of the world’s leading energy watchers says the second shale revolution will come in the form of LNG exports.
-
The expanded research and testing capabilities offer the only vertical test rig for subsea safety valves and one of the largest high-pressure natural gas test facilities in the world.
-
The Prelude FLNG begins the 3,600-mile journey from South Korea to northwest Australia; expected to remain at final destination for 20–25 years.
-
Eni finalized a USD 7-billion investment in the Coral South FLNG project, the first offshore development in Mozambique. Service and equipment providers are announcing their awarded contracts.
-
In a recent acquisition, H2O Midstream will own and operate Encana’s produced-water gathering system in Howard County, Texas, and will expand it to also serve third parties.