Pipelines/flowlines/risers
The Absheron gas field expansion will supply additional natural gas to Azerbaijan’s domestic market and support its export commitments to Turkey, allowing Baku to stay focused on meeting its gas export obligations to Europe.
This work introduces a novel predictive methodology combining historical metocean data with real-time riser analysis for shallow water dynamically positioned rig operations.
The deals, with a potential value exceeding $3.7 billion, are aimed at strengthening Saudi Aramco’s supply chains and expanding its use of industrial artificial intelligence.
-
The criticality of above-water riser hull piping requires frequent inspections. Traditional manual inspection methods present safety and efficiency concerns, but work is being done to see if robotic technologies—such as drones and crawlers—can do the job as good as, or even better than, humans.
-
According to a report published by the Government Accountability Office, the Transportation Security Administration employs only six full-time staffers for its pipeline security branch.
-
The decision may alleviate some of the pressures oil and gas producers faced in the wake of their imposition last year. Canada and Mexico made up a combined 20% of US imports of oil country tubular goods in 2017.
-
Phase 1 of the development today marked the sail-away from Kværner’s yard of the 560-bed living-quarters topside, the largest of its kind in Norway.
-
From its record high in 2014, purchases of subsea equipment and SURF fell around 50% until reaching a low in 2018. New data suggest that the subsea market will be a top-performing oilfield service segment.
-
A newly launched JIP aims to bridge the BSEE and API frameworks and achieve industry consensus on the analysis and inspection data required to assess the feasibility of an extended service life.
-
DCN Diving has received a contract from Dana Petroleum to execute work offshore the Netherlands. Under the terms of the deal, DCN will perform the fabrication, installation, and precommissioning of various tie-in spools and a flanged connector for Dana’s DP-012 gas export pipeline.
-
DCN will execute fabrication, installation, and precommissioning of various components for a gas export pipeline from two platforms in the Dutch North Sea.
-
Anadarko Mozambique Area 1, LTDA, a subsidiary of Anadarko Petroleum Corp., named the preferred tenderers for provision of the subsea production systems. Formal award will follow final agreement of contracts and Mozambique LNG taking a final investment decision, expected in the first half of this year.
-
Wood and KBR inked a multimillion-dollar contract to deliver integrated front-end engineering design (FEED) for Shell Australia's Crux project to build a not-normally-manned (NNM) platform and gas export pipeline located approximately 600 km north of Broome, offshore Western Australia (WA). The Crux field water depth is 110 to 170 m.