Pipelines/flowlines/risers
ExxonMobil and its Area 4 partners have awarded $1.1 billion in pre-investment contracts for long-lead upstream equipment supporting Mozambique's Rovuma LNG project. The awards, led by OneSubsea, mark a key step toward FID as development advances on ExxonMobil's largest global investment.
Williams' acquisition of Momentum Midstream creates a larger, more connected Gulf Coast gas network capable of meeting surging demand from LNG export facilities, power generators, and industrial users.
This paper details the design and implementation of a subsea multiphase pump solution deployed in the Atlanta field designed to maximize reuse of existing subsea and topside equipment.
-
Corrosion is a pervasive issue that affects oil and gas production. It poses a significant threat to the safety and integrity of oil and gas equipment, and it can lead to costly repairs and downtime. Mitigating corrosion is a crucial part of maintaining the productivity and safety of oil and gas operations.
-
Production from the Dover field is expected to start in late 2024 or early 2025.
-
The second phase of the project will analyze data gathered in Phase 1, with the goal of improving riser, wellhead, and conductor fatigue estimates.
-
Congo LNG, expected to hit capacity in 2025, aims to transform the African country into a natural gas exporter.
-
Six satellites are expected to be launched this year to form a constellation aimed at combating emissions along oil and gas pipelines.
-
Russia’s proposed Power of Siberia 2 gas pipeline would enable gas historically exported to Europe to be redirected to China along a single pipeline system that joins the country’s West and East Siberian resource centers.
-
The acquisition will enable Energy Transfer to send more barrels of Permian crude to oil hub at Cushing, Oklahoma.
-
The Agogo Integrated West Hub Development Project is the first new major greenfield project awarded in Angola in more than 5 years.
-
The authors of this paper describe the development of a continuous monitoring solution throughout its deployment.
-
Uganda’s Lake Albert appears on track to first oil by 2025. The oil is expected to be exported via the 1443-km East Africa Crude Oil Pipeline.