Production
North Sea operators produced an additional 16 million BOE from 56 reinstated wells in 2025 as improved intervention efficiency lowered costs and helped restore shut-in assets to production, according to the NSTA.
This contributed article highlights the growing importance of fiber-optic sensing and its potential to advance thanks to emerging quantum technologies.
The DOE-backed EGS-Twin project aims to simulate geothermal production systems, helping operators better predict performance and maximize output.
-
This paper demonstrates the effectiveness of integrating dynamic gas separation with existing gas-avoidance methods within the same electrical submersible pump string to address these issues.
-
The three featured papers illustrate how emerging computational methods—ranging from gradient-based optimization to data-driven proxies—are reshaping reservoir characterization, uncertainty assessment, and real-time decision support across diverse subsurface applications.
-
The operator developed a solution that has kept the well at stable production for over a year after treatment.
-
Leaders of SPE’s Artificial Lift Technical Section outline the group’s mission, recent technical highlights, and a growing slate of global events shaping the future of artificial lift.
-
A multidimensional Wiener process approach predicts casing remaining useful life, enabling safe, cost-effective well life extension and repurposing for carbon dioxide injection, CCS, and geothermal applications.
-
SponsoredUnwanted water production can erode well performance and asset economics if left unmanaged. Interwell’s precision water shutoff approach, grounded in diagnostics and engineered isolation, helps operators identify water-entry points, protect hydrocarbon flow, and restore sustainable well performance in mature and complex wells.
-
Drone strikes, refinery shutdowns, tanker disruptions, and halted LNG production have heightened concerns about broader supply risks.
-
The Middle East’s largest unconventional gas development officially begins production as Saudi Aramco targets 6 million BOE/D of gas and liquids capacity by 2030.
-
The tools to reduce flaring are well within reach, but the results will depend on a long-term commitment by operators and governments.
-
This paper presents a robust workflow to identify optimization opportunities in gas lift wells through real-time data analysis and a surveillance-by-exception methodology.