Reservoir
Beetaloo Energy and Halliburton have signed an MOU to advance Beetaloo Digital, a proposed gas-powered AI data center hub in Australia’s Northern Territory that could create a new long-term market for Beetaloo Basin gas.
The ultrasonic wellbore imaging firm is being taken over by Blackstone, the world's largest alternative asset manager.
This article from the SPE Integrated Reservoir Management Technical Section (IRMTS) addresses decisions that look stronger than they are and take longer to implement than the reservoir can afford.
-
SponsoredUnwanted water production can erode well performance and asset economics if left unmanaged. Interwell’s precision water shutoff approach, grounded in diagnostics and engineered isolation, helps operators identify water-entry points, protect hydrocarbon flow, and restore sustainable well performance in mature and complex wells.
-
More than 150 researchers will work on the Libra Rocks project, which aims to unlock insights that could improve recovery and reservoir management in one of Brazil’s largest offshore oil fields.
-
The Middle East’s largest unconventional gas development officially begins production as Saudi Aramco targets 6 million BOE/D of gas and liquids capacity by 2030.
-
This paper provides an account of the design, implementation, and operational insights from an enhanced geothermal system proppant stimulation targeting a volcanic, dry rock setting with an approximately 330°C bottomhole temperature.
-
This paper introduces an agentic artificial-intelligence framework designed for offshore production surveillance and intervention.
-
This study evaluates the feasibility of drilling a closed-loop, unconventional geothermal system in the Pannonian Basin basement of Romania.
-
The authors describe the effectiveness of an electromagnetic look-ahead service while drilling in terms of providing accurate formation profiles ahead of the bit to optimize geostopping efficiency.
-
The paper describes a multientry multistage fracturing technology developed to enable longer laterals, increase stage counts, improve stimulation efficiencies, and derisk operations.
-
This work demonstrates that a carefully engineered wireline perforation strategy can address the challenges of long-interval high-pressure/high-temperature completions with large intrareservoir-pressure differentials safely and effectively.
-
This paper describes modeling work performed to design fracturing treatment and spacing for wells in the Project Cape enhanced geothermal system in Utah.