The complete paper discusses an approach used to sectorize a mature onshore Abu Dhabi giant carbonate reservoir for the purposes of reservoir management, offtake, and injection balancing. The reservoir is developed under a line-drive water-alternating-gas (WAG) scheme in combination with peripheral water injection. The development plan for the reservoir includes massive deployment of maximum reservoir contact (MRC) horizontal wells and a gas-based enhanced oil recovery scheme. A practical data-driven approach, based on one of the operator’s integrated reservoir management (IRM) workflows, was selected for the purpose of sectorization.
Field Development Background
Reservoir A is part of a giant oil field considered low permeability.
×

Continue Reading with SPE Membership
SPE Members: Please sign in at the top of the page for access to this member-exclusive content. If you are not a member and you find JPT content valuable, we encourage you to become a part of the SPE member community to gain full access.