Testing page for app
-
Driven by Mozambique’s Area 1 and Area 4 projects, Africa is poised to become the dominant LNG investment destination by the end of this year, with the continent seeing nearly one-third of total greenfield investment.
-
As a disturbance in the Gulf of Mexico continues to develop, about 32% of the oil production and 18% of the natural gas production in the GOM has been shut in.
-
Recommended Practice 2001, Fire Protection in Refineries, includes important revisions on hazard analysis, new ways to improve the design of refineries to help prevent fires, and new information on managing the potential environmental impact of firefighting foams and marine firefighting.
-
Not all produced water is the same. A seminar held by SPE and associated with the Water Life Cycle and Strategy Technical Section will look at the different types of produced water and the different ways in which produced water is handled in various regions around the world.
-
The new milestone was reached less than a year after the country surpassed 11 million B/D last summer, and is driven by activity in the Permian Basin and new fields in the Gulf of Mexico.
-
The world’s largest oil producer has awarded $18 billion in engineering, procurement, and construction contracts as part of its Marjan and Berri expansion projects.
-
Right at the start of what will be at least a year-long endeavor, the state agency tasked with implementing a comprehensive new oil and gas law has hit the pause button to sort out conflicting messages from the public.
-
Among other things, Bill C-69 has replaced the Canadian Environmental Assessment Act, 2012, with an Impact Assessment Act, replaced the National Energy Board Act with a Canadian Energy Regulator Act, and made changes to the Navigation Protection Act.
-
Equinor has awarded DeepOcean a contract to perform marine operations in connection with installation of the Vigdis Boosting Station and associated in-field structures and flexibles. The deal covers project management, engineering, and offshore installation activities. The offshore work includes marine operations for rock removal, installation and tie-in of subsea lin…
-
Growing supply of Permian crude oil means the basin will need extra takeaway capacity of up to 500,000 B/D by the end of the 2020s, according to new research from Wood Mackenzie.