Testing page for app
-
The Norwegian operator’s disclosure marks the first time all subsurface and production data from a field on the NCS will be available for public viewing.
-
Each year, SPE selects professionals, nominated by their peers, to share their knowledge and expertise with SPE members through visits to local sections.
-
Digital Planning and Modeling Enhances Performance of Whipstock Sidetracking System in Complex WellsCombined with advances in whipstock and milling technologies, digital technologies are enabling operators to plan and conduct sidetracking operations with improved flexibility, precision, and efficiency.
-
The Petroleum Safety Authority Norway launched an investigation into an LNG leak at the Hammerfest LNG plant on 17 June.
-
In the last decade, a series of tort claims have been brought in the US against oil, gas, and coal producers; power companies; and car manufacturers seeking compensation for loss and damage said to be the result of climate change caused by greenhouse-gas emissions. To date, none has succeeded.
-
Bentley Systems announced the acquisition of Synchro Software, which links three-dimensional building information modeling (BIM) deliverables with the time dimension to synchronize, through digital workflows, the construction strategy, work breakdown structure, schedule, costs, resources, supply chain logistics, and progress of a construction project. The software’s f…
-
AkerBP is putting to the test Lloyd's Register’s (LR) RTAMO (Real-Time Adaptive Maintenance Optimization) software for maintenance optimization of its Skarv FPSO infrastructure and equipment in Norway. AkerBP aims to optimize the criticality and cost of its maintenance activities. The software is a standalone cloud-based software-enabled service that is based on predi…
-
Already poised to produce more than 500,000 B/D offshore Guyana, ExxonMobil added yet another discovery to its bounty in the emerging regional oil powerhouse, meaning a fourth development phase could be in order.
-
Cheniere Energy requested issuance of the feedstock permit from FERC by 29 June. The FID for Train 3, estimated at approximately $3 billion, was announced last month. Bechtel got the green light to proceed with EPC work, subcontracting with BHGE for the gas turbines to drive compressors.
-
Permian oil output is growing fast, pipeline capacity is full with little relief in sight, truck drivers are in short supply, and the value of basin-produced crude is sinking. Is a drop off in activity—including drilling and production—becoming inevitable?