Testing page for app
-
Industry's finest minds are expected to come together for an idea summit during the upcoming SPE Intelligent Energy International Conference and Exhibition in Aberdeen.
-
This paper presents experimental and field-case studies with a sandstone-acidizing treatment designed to retard the hydrofluoric acid reaction rate and enable single-stage treatment.
-
This paper studied three residual-free fluid systems for acid treatments and fracturing in order to develop no-damage or reduced-damage and highly effective stimulation techniques for long-interval wells.
-
A 2-year comprehensive effort to design, test, manufacture, and deploy a new high-pressure completion tubular for Chevron’s deepwater Gulf of Mexico (GOM) operations is presented.
-
A real-time method is presented to predict impending stuck pipe with sufficient warning to prevent it. The new method uses automated analysis of real-time modeling coupled with real-time-data analysis.
-
This paper describes a gas-injection pilot that has been implemented in offshore Middle East carbonate reservoirs to assess injectivity, productivity, macroscopic-sweep efficiency, flow assurance, and operational efficiency in a field that has a long water-injection history.
-
The operator has initiated a cyclic-steam-stimulation project in the Opal A diatomite of the Sisquoc formation on the Careaga lease in the Orcutt oil field in Santa Barbara County, California. This paper discusses steam-injection step-rate tests (SRTs) for this asset as part of its expansion.
-
The polymer-injection project in the Dalia field, one of the main fields of Block 17 in deepwater Angola, represents a world first for both surface and subsurface aspects.
-
The Loma Alta Sur (LAS) field is a multilayer fluvial sandstone reservoir in the Neuquén basin of Argentina. Colloidal-dispersion-gel injection was considered a viable strategy to improve oil recovery in the field after early water breakthrough.
-
Challenging environments such as unstable clay formations represent high operational risk when running tubulars after drilling is completed.