Testing page for app
-
Microdoglegs are a natural effect of any vertical or directional well that can explain a wide variety of downhole problems.
-
A new fatigue-management work flow provides drillers with a tool to simulate and predict the life expectancy of bottomhole assemblies (BHAs) before fatigue causes problems.
-
The complete paper holds that traditional facilities-planning methodologies, heavily based on design-basis documents and biased toward the most-conservative conditions, fail to recognize the entirety of operational conditions throughout the oilfield life cycle.
-
Understanding and prioritizing water management is key for exploration-and-production operators, not only in terms of reducing overall cost but also as a means of mitigating operational risk, complying with changing regulatory requirements, and addressing environmental concerns.
-
As part of a comprehensive water-management strategy, this paper describes different process and operational considerations that are the result of 109 years of production in Argentina’s oldest basin.
-
This paper discusses the field trials of a new salt-tolerant friction-reducer system in the Marcellus Shale.
-
A new water-shutoff polymer system has been developed for carbonate formations and shows great stability.
-
In response to questions from lawmakers on whether federal law adequately provides for the prosecution of "criminal activity against infrastructure," the Department of Justice recently committed to "vigorously" prosecute those who damage "critical energy infrastructure in violation of federal law."
-
Safety has always been a top concern for oil and gas suppliers. Because pipelines must operate 24 hours a day and 365 days a year, safety, high availability, and reliability are key requirements for smooth operations and, ultimately, profitability.
-
Independent Project Analysis researchers took a closer look at site project system staffing approaches including full alliance, owner engineering, contractor engineering, and core staffing to determine the effect of staffing characteristics on capital project outcomes.