Testing page for app
-
Oil companies are considering whether shutting in a well for a month or so may mean stronger production later by allowing more time for water to soak into the rock, which gets it out of the way of the oil and gas. But this is not always effective, and additional work is needed.
-
This month is the deadline to nominate someone for one of SPE’s numerous international awards. The awards are designed to recognize individual contributions to the oil and gas industry and to the petroleum engineering profession.
-
Without exception, the featured articles reflect increased volumes of surface and downhole data that are being captured and analyzed to enable deep learning, improved efficiency, safety, and value.
-
Drilling systems automation (DSA) is moving into commercial activities on a broad front. Equipment suppliers are delivering automated drilling-control systems, and everyone (equipment suppliers, service companies, drilling contractors, operators) is delivering systems-automation applications.
-
The complete paper describes the shortcomings of traditional well testing methods and the methodology and results of applying wireline-conveyed IPTT in a light-oil reservoir offshore Norway.
-
The complete paper presents a process used to successfully implement a rig-based drilling advisory system (RDAS) across a mixed group of rig contractors.
-
The complete paper presents a drilling semantic framework that allows software solutions to achieve automatic and versatile self-configuration.
-
One of the frustrating aspects of well-productivity analysis is identifying the causes of lower-than-expected production/injection during initial well lifetime. Our task is to evaluate the multivariate aspects of well design.
-
In the current work, a rig advisory system is developed to continually improve rate of penetration (ROP) and drilling performance. An intelligent drilling advisory system (IDAS), based on a soft closed-loop solution with multiple regression analysis has been established.
-
For the development of the Dvalin high-pressure/high-temperature (HP/HT) gas field in the Norwegian Sea, a completion scheme using standalone screens is planned.