Latest News
-
Volatile organic compounds (VOCs) present in crude oil can be released to the atmosphere from storage tanks, waste waters, and equipment leaks. A pilot-scale sequential biotrickling/biofiltration unit was designed and tested for removal of VOCs from a wastewater sump.
-
Sourcing water for hydraulic fracturing, and disposing of produced water, are constraints and significant cost items in the Permian Basin. Some of the produced water can be treated and reused by using a water life cycle approach..
-
Reducing a separation system’s footprint while increasing separation efficiency is demonstrated in an Oklahoma field trial.
-
Current production from the phase is 400 MMcf/D and expected to peak at 700 MMcf/D. A third phase also is slated to come on stream this year.
-
Inspection data management system software can help companies bolster their mechanical integrity programs, but choosing the wrong software can have a lasting impact on a company’s operations. So, what goes into finding the right software for your needs?
-
The jacket, constructed in Texas over 18 months, completed the journey on a 180-m-long barge across the Atlantic Ocean to the Mediterranean site in 28 days, arriving in late January.
-
Trendsetter Engineering completed its 2-year design and build work for Noble Energy’s Leviathan project.
-
The Eagle Ford Shale has reclaimed its standing as one of the most attractive US onshore liquids basins, and for good reason. Does this mean more operators will seek to buy in to the play, and could further consolidation take hold following last year’s big deals?
-
Poland’s PGNiG is calling for contractors for an LNG terminal expansion and construction of an additional jetty.
-
Finding water for hydraulic fracturing and then finding a use for it when it flows back are critical engineering problems to solve in the booming Permian Basin.
-
DCN will execute fabrication, installation, and precommissioning of various components for a gas export pipeline from two platforms in the Dutch North Sea.
-
Teekay Offshore has agreed to a 3-year contract extension with Petrobras for the Piranema Spirit, an FPSO located in the Piranema field offshore Brazil. The agreement, which includes termination rights for Petrobras with 10 months’ advance notice, was signed in January but takes effect this month.
Explore Content by Discipline
Trending Content
Get JPT articles in your LinkedIn feed and stay current with oil and gas news and technology.