Latest News
-
Upstream separation processes remain a hot topic for facilities engineers. Striving to design separators with the optimal sizing for a variety of reservoir conditions, increasing water cuts, and dynamic gas/oil/water production characteristics is critical, but challenging.
-
With events such as the BP Macondo blowout in the US Gulf of Mexico (2010) and the Pemex Ayatsil-C platform accident (June), the safety risks inherent in oil and gas projects are evident.
-
Although the commissioning of a floating production system (FPS) generally takes place between the “mechanical completion” and “first oil” stages, commissioning activities begin long before then.
-
LLOG Exploration’s Delta House floating production system (FPS) looms large over Kiewit Offshore Services’ fabrication yard in Ingleside, Texas.
-
A rigorous SHE&S program on the Barzan Onshore Project tracked 211 deliverables on a monthly basis and led to 131 million man-hours worked without a lost-time incident from July 2012 to March 2014.
-
After severe damage in a typhoon, the Huizhou oil field in the South China Sea was back on production in 5.5 months. This paper reviews how this feat was accomplished.
-
While storage and logistics are critical elements of the viability of water reuse, if the water chemistry is not fit for gel fracturing formulations, it will not matter how much is stored in centrally located impoundments.
-
Over the next 5 years Douglas-Westwood (DW) expect USD 122 billion to be spent on global subsea vessel operations—an increase of 64% compared with the previous 5-year period.
-
A few weeks ago, I noticed that someone had viewed my LinkedIn profile. We all have had this happen, and often it will be recruiters or business development professionals looking for contacts, or people who wish to remain anonymous for some reason.
-
The factors contributing to out-of-control costs and delayed deliveries of projects are many. They range from unrealistic early cost and time estimates and human factors to the effects of geopolitical events.
-
The high failure rate of projects is well documented. Companies want to find the most efficient ways of managing their investments, and when those investments do not meet their targets, they want to know the reasons.
-
“Change” was the theme of Offshore Northern Seas (ONS) 2014 in Stavanger, Norway, in August. While commemorating the conference’s 40th anniversary, speakers called for changes in “business as usual.”
Explore Content by Discipline
Trending Content
Get JPT articles in your LinkedIn feed and stay current with oil and gas news and technology.