Openhole Gravel-Pack in Depleted GOM Reservoirs Achieved With Alternative Approach

This paper discusses the successful execution of two openhole gravel-pack completions in two Gulf of Mexico fields with depleted reservoirs.

Fig. 1—Pumping-equipment SIT setup.
Fig. 1—Pumping-equipment SIT setup.
Source: SPE 227908.

In Gulf of Mexico deepwater, most reservoirs are unconsolidated formation sands that require sand-control completion. Cased hole frac-packing historically has been the default technique. However, in many fields, prioritization of pay access across multiple stacked sand packages or across faults in the reservoir has driven the operator to evaluate the feasibility of openhole gravel-pack (OHGP) completions. This paper discusses the successful execution of two OHGP completions in two fields with depleted reservoirs.

Sandface Completion Selection and Design

Because both wells have a low fracture margin, shunted screens were required to ensure that complete packing in the fracture pressure was exceeded during the job execution.

×
SPE_logo_CMYK_trans_sm.png
Continue Reading with SPE Membership
SPE Members: Please sign in at the top of the page for access to this member-exclusive content. If you are not a member and you find JPT content valuable, we encourage you to become a part of the SPE member community to gain full access.