Exploration/discoveries

Shell Signs Concession for Oman Block 10

Petroleum Development Oman is building infrastructure for the project’s initial phase.

Oman map

Shell, along with its partners OQ and Marsa Liquefied Natural Gas LLC (a joint venture between TotalEnergies and OQ), have signed a concession agreement with the Ministry of Energy and Minerals on behalf of the government of the Sultanate of Oman to develop and produce natural gas from Block 10. The parties also signed a separate gas sales agreement for gas produced from the block. The two agreements follow an interim upstream agreement signed in February 2019.

The concession agreement establishes Shell as the operator of Block 10, holding a 53.45% working interest, with OQ and Marsa LNG holding 13.36% and 33.19%, respectively. For the initial phase, Petroleum Development Oman (PDO) is building the infrastructure for the project, including the main pipeline to the Saih Rawl gas processing facility, on behalf of the Block 10 venture partners. The venture will drill and hook up wells to maintain the production beyond the initial phase. The block is expected to reach production of 0.5 Bcf/D. Startup is expected within the next 2 years.

In addition, Shell and Energy Development Oman (EDO) signed an agreement to process the natural gas from Block 10 in EDO’s Saih Rawl facility. Shell and the government have agreed that, in parallel to the development of Block 10, Shell will develop options for a separate downstream gas project in which Shell could produce and sell low-carbon products and support the development of hydrogen in Oman.