Campos Basin
-
One of the company’s pipelay and construction vessels will install rigid and flexible pipelines for Equinor’s Peregrino Phase 2 project, adding an estimated 273 million bbl of recoverable oil to the field.
-
This paper presents a retrospective of the most-significant technologies developed and deployed in the Campos Basin for more than 80 production systems in more than 30 oil- and gas-field developments.
-
The paper provides a fast-track approach to perform screening assessment of multiple subsea concepts.
-
To increase the oil recovery in the Albacora field, significant water injection is required that was not considered in the initial project-development phases.
Page 4 of 4