Malaysia
-
This paper presents the first successful application of ceramic sand screens offshore Malaysia. Ceramic sand screens were considered as a remedial sand-control method because of their superior durability and resistance compared with metallic sand screens.
-
An early commitment to integrate MPD into an HP/HT drilling operation can make MPD more than just an enabling tool and turn it into a performance tool that offers significant operational benefits.
-
The field marks the first development in Malaysia for the Abu Dhabi-based operator, with first gas expected in 2021.
-
With these synopses of technical papers from OnePetro you can join the author for conferences in Kuala Lumpur, New Orleans, and Lagos, all while sitting in your chairs and without any travel expenses.
-
Pore-pressure prediction plays an important role in well planning as exploration targets shift to deeper, overpressured reservoirs.
-
This paper describes the first job in southeast Asia in developing horizontal-well placement in a turbidite environment.
-
The Samarang oil field, offshore Sabah, Malaysia, is undergoing a redevelopment project with integrated operations. Several work flows were designed and deployed in order to achieve an early milestone of providing real-time well-performance monitoring, surveillance, and optimization.
-
A matured field is currently producing with greater than 85% water cut (WC) and has significant levels of uncertainty with respect to oil/water contact (OWC), flank structure, depth of spill points, production allocation, and residual oil saturation.
-
Despite hostile wellbore conditions, an operations team overcame challenges of drilling-fluid design and management to drill the first ultrahigh-pressure/high-temperature (HP/HT), deep-gas well offshore Malay Peninsula.
-
Telok is a gasfield development in the Malay basin offshore Terengganu, Malaysia. This paper discusses the program learnings and operational improvements captured while completing eight new wells in 2012 and 2013.