multilaterals
-
This paper discusses the first multilateral well with a Level-4 junction combined with an inflow-control device (ICD) planned, designed, and drilled in the Upper Burgan reservoir of Raudhatain field, north Kuwait.
-
The first multilateral well in a North Kuwait field has been drilled recently.
-
This paper describes an all-in-one system that combines nodal-analysis and numerical-simulation models to calculate the effect of intelligent-completion components—such as swell packers, internal control valves, and inflow-control devices—on lateral production profiles.
Page 2 of 2