Drilling
This paper presents the application of degradable particulate-diverter technology to improve oil production by effectively diverting stimulation treatment fluids away from high-water-cut, high-permeability, high-temperature producing intervals or zones.
This case study from ARC Resources and DarkVision outlines the use of acoustic imaging tools in two active fracturing programs in Canada to monitor well casing deformation.
Adequate consideration must be given to the potential effect of each fluid on the successive phase operations to ensure integrated well-fluids system management.
-
This paper reviews the technology trends in cement-job evaluation using logging tools and considers the main advantages and concerns associated with each technology.
-
As I read through the abstracts and papers that have been presented in the past year, I notice several key themes: verification of cement placement, development of new materials as a barrier, development of new additives to improve the cement barrier, and enhancement of existing techniques.
-
This paper reviews a successful managed-pressure-cementing (MPC) operation and presents findings and lessons learned.
-
Operators at a UAE field experienced several challenges while cementing production sections. A systematic approach was applied that used standard cementing best practices as a starting point.
-
The influx-management-envelope (IME) concept is an advanced, innovative way to assess influx conditions in managed-pressure-drilling (MPD) operations, offering an improved tool for the decision-making process.
-
This paper discusses the successful design, laboratory testing, and performance of an innovative, low-solids, organophilic-clay-free invert-emulsion fluid (OCF-IEF) used to drill the reservoir section of an extended-reach-drilling (ERD) well.
-
Current long-reach technology already has a large effect on oil recovery. Many possible improvements, however, remain, and we see new contributions every year.
-
The Peregrino project, located in the post-salt zone of the Campos Basin, presents immense challenges for drilling extended-reach wells. This paper shares challenges imposed by the well profile and downhole environment on the design and execution phases.
-
This paper presents a concept that enables simultaneous drilling and completion, with an aim to extend well reach substantially and with an ultimate objective of constructing 30-km-long production wells.
-
A producer and a service company have collaborated to develop a downhole system to merge multilateral technology and intelligent completions to create “smart laterals.”