Directional/complex wells

Simultaneous Drilling, Completions Concept Hopes To Extend Drilling Distances to 30 km

This paper presents a concept that enables simultaneous drilling and completion, with an aim to extend well reach substantially and with an ultimate objective of constructing 30-km-long production wells.

jpt-2018-05-178859hero.jpg

Current extended-reach-drilling (ERD) well technology limits the well lengths to approximately 12 km, with a horizontal departure of approximately 10 km. This paper presents a concept that enables simultaneous drilling and completion, with an aim to extend well reach substantially and with an ultimate objective of constructing 30-km-long production wells. Longer-reach wells can be used to drain remote reserves using existing production facilities and to provide a means to access reservoirs located beneath environmentally sensitive areas.

Concept Description

The concept introduces a new way of constructing production wells. During drilling, the annulus is closed by packers and the well is drilled to the final target with one hole diameter.

×
SPE_logo_CMYK_trans_sm.png
Continue Reading with SPE Membership
SPE Members: Please sign in at the top of the page for access to this member-exclusive content. If you are not a member and you find JPT content valuable, we encourage you to become a part of the SPE member community to gain full access.