Field/project development
TotalEnergies signed off for 30% operated stakes in the Lang Lebah and B14 gas fields offshore Sarawak on the sidelines of ADIPEC in Abu Dhabi, while also highlighting methane-reduction partnerships in Angola, India, and Southeast Asia.
New rules requiring Mozambique’s LNG industry to supply 25% of production to the domestic market could stabilize gas deliveries to South Africa’s Secunda industrial center as the Pande and Temane gas fields near depletion.
This work elaborates on recommended practices for calibrating a numerical model to a set of available infill-well field observations.
-
The companies will work together to increase future production and value creation at their respective assets in the Norwegian Continental Shelf.
-
After a decade and a half of declining production, Uzbekistan, ranked 15th worldwide in gas output, has been seeking foreign partners to revive and reverse the fortunes of its oil and gas industry.
-
While often associated with smaller discoveries, subsea tiebacks are playing a growing role in contributing to the broader energy mix.
-
AI‑driven data center growth is straining US power grids and accelerating interest in enhanced geothermal systems as a scalable, low‑carbon solution.
-
The following three papers show challenges and potential solutions across various stages of the deepwater well-development cycle from a variety of deepwater basins across the world.
-
The authors describe a study on key technologies for intelligent risk monitoring of workover operations.
-
The authors write that by replacing outdated, labor-intensive processes with an integrated, cloud-based platform, companies can streamline planning, improve accuracy, and foster better coordination across teams and vendors.
-
The authors write that deployment of artificial-intelligence-based high-gas/oil ratio well-control technology enabled stabilization of well performance and maintenance of optimal production conditions.
-
This paper presents the first global application of autonomous drilling in deepwater and the journey to reach optimal drilling parameters, integrating proprietary tools from the project’s business partners.
-
The paper describes the revalidation of a deepwater prospect that resulted in a no-drill decision.